• Home
    • About SMLD
    • Contact Us
  • Commissioners
  • Press Releases
  • Public Notices
    • Agendas & Minutes
  • Maps
    • St Mary Base Map
    • East of the Atchafalaya
    • East of the Atchafalaya River
    • West of the Atchafalaya
    • West of Calumet
  • Projects
  • Permitting Process
  • emergenciesEmergencies
Home Projects

Installation of Hesco Baskets along the Charenton Canal

Print

Emergency effort implemented due to the predicted over active hurricane season. These baskets will stay in place until final work

may be completed on particular deficiencies in the levee system.

 

 

7

Read more...

 

Yokely Levee Improvements

Print
Description

During Hurricane Ike, the Charenton Navigational Canal overflowed its banks and inundated the Yokely drainage area with storm surge. Levee improvements and construction of a berm parallel to Industrial Road and the Charenton Navigational Canal south of US 90 are needed to prevent damages from storm surge inundation.

Read more...

 

Hanson Canal and Yellow Bayou

Print
— Flood Control Structures

Description

Hanson Canal and Yellow Bayou, both similar to the Franklin Canal, were designed to serve as conduits for removal of stormwater following normal rainfall events. However, during hurricanes and related events, both serve as a means for reverse flow generated by storm surge. Hurricanes Rita and Ike are recorded example events. Closures and levee improvements are needed to prevent surge flows from moving inland during surge events.

Read more...

 

Amelia Flood Protection Improvements

Print
— Initial Phase (Partial Miller Plan Alternative 2E)


Description

Amelia flood protection presently consists of a somewhat disparate, non-certifiable levee system which offers minimal backwater flooding protection from Bayou Boeuf and Lake Palourde. Drainage District No. 6 applied for Statewide Flood Control Program funds to increase the height of the levee to a consistent 7 ft. MSL. Partial funding was granted. However, this initial phase is but a fraction of the proposed comprehensive levee system needed for the Amelia vicinity as proposed by the drainage district and state and federal authorities. Other phases are noted in both the 10-year and 20-year program presented below.

Read more...

 

Morgan City Levee Improvements

Print
Description
 
The need for levee improvements in Morgan City was brought to the forefront by FEMA’s issuance of new preliminary Digital Flood Insurance Rate Maps (DFIRMs)  in 2009, recent levee profile surveys, and a subsequent appeal to FEMA issued by the City of Morgan City. Being proactive in flood protection, the citizens within Consolidated Gravity Drainage District No. 2 (Morgan City and vicinity) passed a bond election in late 2009.

Read more...

 
More Articles...
  • Franklin Canal Closure & Levee Improvements

<< Start < Prev 1 2 Next > End >>

Page 1 of 2

SMLD Info
  • About Us
  • Contact Us
  • Commissioners
  • Minutes

What's New
  • 2011 Permitting Process
  • Update on St. Mary Levee District Projects
  • Installation of Hesco Baskets along the Charenton Canal
  • Act 1020
  • Yokely Levee Improvements
Flood Warnings
Please make the Cache directory writable.

Powered by ADPG

Login